How paying for a building in stages works
We split your written quote into the five stages of the building and invoice them one at a time, each before its own work begins. At no point do you pay for the whole house up front.
Take a 3-bedroom bungalow on Lagos mainland, finished to mid-range: the guide range for its foundation, the first stage you pay for, is ₦19.4 million to ₦22.6 million at prices on 16 November 2026.
One invoice for each stage
The written quote lists five stages, each with its own amount, from the foundation up to handover. Each of those amounts becomes one invoice, and no invoice ever covers more than its own stage.
The foundation is invoiced before any ground is broken. Each of the next three is sent only once you have looked over the stage just finished. The handover invoice, the last one, comes before the kitchen, wardrobes and other fittings go in. What goes into each stage, from the concrete footing to the snag list, is set out in the five stages of building a house.
How a guide range splits across the stages
Here is that bungalow on Lagos mainland, stage by stage, at prices on 16 November 2026. Your real invoices follow your written quote, not this table, but the shape is usually much the same.
| Stage | When the invoice comes | Guide range |
|---|---|---|
| Foundation | Before we break ground | ₦19.4 million to ₦22.6 million |
| Walls and structure | After you see the foundation | ₦12.2 million to ₦14.2 million |
| Roof | After you see the walls | ₦8.5 million to ₦9.9 million |
| Finishing | After you see the roof on | ₦35.5 million to ₦41.4 million |
| Handover | Before the kitchen and fittings arrive | ₦15.1 million to ₦17.6 million |
| Whole house | Never in one invoice | ₦90.7 million to ₦105.7 million |
The stages are far from equal. Finishing is the largest here and the roof the smallest, so plan your money around the stage that comes next rather than an average. The cost calculator shows the same split for other houses, finishes and places.
Between one invoice and the next
Once a stage invoice is paid, that stage is built. When the work is done you get a stage report with photos, and you are welcome to come and look at it on site. Only after you have seen the stage do we send the next invoice.
This rhythm means the money you have paid always matches work you can see, or work that is about to start. Nothing is paid ahead for stages that are still far off, and if something in a finished stage needs explaining, you can ask about it before the next amount is due.
Why we work this way
A house is a large sum, and few people have all of it in hand at the start. Paying stage by stage lets you plan for one part of the house at a time, and see your money turn into concrete, blockwork and roofing before you send more.
It also keeps everything in the open. Building materials change price with the market, and each stage amount in your quote is worked out from prices on the day the quote is written. You know what every stage will cost before the first one starts, so you can line up your savings against it.
Paying from another state or from abroad
Since every stage is invoiced separately and reported on separately, there is no need to be on site to pay or to check the work. If you live in another state or another country, the stage reports and photos let you follow the house from there. Read how to build in Nigeria from abroad, or see the building from abroad service.
From a guide figure to your first invoice
Start with the calculator for a guide range, then press “Get my written quote”, or message us on WhatsApp. We answer on WhatsApp, ask a few things about the site and any drawings, and then send a written quote broken into stages. That quote, priced on the day it is written, is what your invoices follow. You do not need drawings to ask; we can have them prepared first.
Questions and answers
Do I pay for the whole building before work starts?
No. The first invoice covers the foundation stage alone. After that, you get the next invoice only when the previous stage is finished and you have seen it. Handover is always the last.
Is the stage invoice the same as the calculator figure?
No. The calculator gives a guide range dated 16 November 2026. Your invoices follow the written quote for your own drawings and site, which is costed at the market prices of its own date.
How do I see a stage before paying for the next one?
Each finished stage comes with a report and photos. You can also visit the site yourself, or send someone you trust to look on your behalf.
Are the fence and borehole part of the stage amounts?
Only if you add them. Work outside the house, such as a boundary fence with its gate, a borehole with a tank, or paving for the compound, is not in the stage figures. The calculator shows each of these on its own line once you choose it.
What does the last invoice cover?
Handover, the fifth stage. It pays for the fittings that make the house ready to live in, such as the kitchen cabinets, the wardrobes and the bathroom and light fittings, together with the water tank. Then the final coat of paint goes on, the house is cleaned through and everything is tested. It ends with a walk round the snag list, the small things still to put right, and then you get the keys.
Where to go next
- Building cost calculatorYour building, stage by stage
- Cost of a 3-bedroom bungalow₦75.7m to ₦88.3m, mid-range finish
- 3-bedroom bungalow in Lagos₦90.7m to ₦105.7m, mid-range finish
- Cost of building a house in NigeriaEvery reference building and place
- The five stagesGuide
- Building from abroadGuide
- All guidesPlain answers about building