Build in stages.
Pay in stages.

We build, finish and renovate homes and business premises across Nigeria. See what your building will cost below, stage by stage. Then get one written quote, and pay for each stage before its work starts.

Or call 0802 859 5303

What will your building cost?

Answer a few questions. The estimate shows at once, stage by stage. No email needed.

What is the job?

What kind of building?

How big?

We price it as about 135 sq m of floor area.

What finish?

Thicker long-span roof, POP ceilings, porcelain tiles, security entrance door, casement windows, better kitchen, wardrobes and bathroom fittings.

Where is the site?

What is the land like?

Add anything outside?

What we build

Built ready for the rest of ZuraLink

The cheapest time to run a cable is before the walls are plastered. Ask for any of these to be built in.

What building costs today

Guide ranges for cities outside Lagos, Abuja and Port Harcourt, at prices on 16 November 2026. Use the calculator above for other places and sizes.

HouseFloor areaStandard finishMid-range finishPremium finish
2-bedroom bungalowabout 95 sq m₦43.3m to ₦50.6m₦55.6m to ₦64.9m₦77m to ₦89.8m
3-bedroom bungalowabout 135 sq m₦59.3m to ₦69.2m₦75.7m to ₦88.3m₦103.3m to ₦120.6m
4-bedroom bungalowabout 175 sq m₦75.4m to ₦88m₦95.7m to ₦111.6m₦129.6m to ₦151.2m
4-bedroom duplexabout 270 sq m₦125.2m to ₦146m₦148.5m to ₦173.2m₦189.2m to ₦220.8m
5-bedroom duplexabout 330 sq m₦151.5m to ₦176.9m₦179m to ₦208.9m₦227m to ₦264.8m
Block of 4 two-bedroom flatsabout 400 sq m₦198.4m to ₦231.4m₦240.9m to ₦281m₦316.6m to ₦369.3m

Guide figures for a complete house on firm land, without the land, drawings, fence or borehole. Your written quote is priced against the market on the day and is the only firm price.

From an estimate to the keys

  1. Send your estimateFrom the calculator, here or on WhatsApp.
  2. We look at the site and drawingsOr help you get drawings made.
  3. You get a written quote in stagesEvery stage has its own amount.
  4. Pay for a stage, we build itThe invoice for a stage comes before its work starts.
  5. See the stage, then the nextOn site or by photos, before the next invoice.
  6. HandoverWe walk through the finished work with you.

Questions people ask first

How close is the calculator to the real price?

It is a guide. It uses market prices for cement, blocks, iron rods, roofing and finishes on the date shown, for a house of the floor area shown. Your drawings, your site and the prices on the day decide the real figure, which is why we give a written quote before any work starts.

Can I pay as the building goes up?

Yes. That is how we work on every job. Your quote is split into stages and each stage is invoiced before its work starts. You never pay for the whole building at once.

Why does waterlogged land cost more?

Soft or wet ground cannot carry an ordinary foundation. The building usually needs a reinforced concrete raft and sand filling, which takes far more concrete and iron. A soil test settles it.

Can I build while I live abroad or in another state?

Yes. Because every stage has its own invoice and its own report, you can follow the work and pay from anywhere.

I started a house and stopped. Can you finish it?

Yes. We inspect what is standing, tell you plainly what can stay, and quote only for what is left.

Do I need drawings before I ask for a quote?

No. Send your estimate with what you have. If you have no drawings yet, we can have them prepared before the quote.

Where we build

ZuraLink Spaces is a construction company that builds, finishes and renovates in Lagos, Abuja, Port Harcourt and across Nigeria. Each city page has its guide figures and local notes.

Costs, services and guides

Every figure on these pages comes from the same price list as the calculator, dated 16 November 2026. Or see the calculator on its own, the areas we build in and our projects page.

What building costs

What we build

Guides

More from ZuraLink

₦90.7m to ₦105.7mGuide estimate
See the stages