How to build in Nigeria from abroad

Build in stages, and pay in stages. Every stage of the house is invoiced before its work starts and reported on with photos when it is done, so you can watch the house go up and pay from wherever you live.

Each stage is finished and shown to you before you are asked to pay for the next, and at no time do you send money for the whole house at once.

Start with a guide figure you can share

The cost calculator works the same from London, Houston or Dubai as it does from Lagos. Pick the house, the finish, the place and the land, and you see a guide range stage by stage, dated 16 November 2026. A 4-bedroom duplex at mid-range in Lekki, Ajah or Lagos Island, for example, comes to ₦200.3 million to ₦233.8 million; a 3-bedroom bungalow at the same finish in Abuja comes to ₦83.2 million to ₦97.1 million.

The “Send it on WhatsApp instead” button puts your whole estimate into one message to us, which is handy if you are planning with family at home and want everyone looking at the same figures.

Asking for a written quote from abroad

Use “Get my written quote” in the calculator. The form wants your name, the WhatsApp number we should use, and where you plan to build, by town and state; an email address is optional, for a copy of the quote. Or simply message us on WhatsApp. We reply on WhatsApp with questions about the site and any drawings, then send the quote in writing, split into stages.

You can start without drawings. If there are none, we can get them drawn up for you first.

What you receive at each stage

For every stage there are two things. Before the work, an invoice for that stage alone. After it, a stage report with photos of what was built. You look through the report, ask whatever you want to ask, and only then does the next invoice arrive.

The order is fixed. First comes the foundation, invoiced before any digging; then walls, roof and finishing, each invoiced once you have looked at the work before it; and finally handover, invoiced before the fittings are brought in. How paying in stages works sets this out in full.

Seeing the work without flying home

The photos in each stage report let you see the blockwork, the roof or the tiles as they really are. If a relative or friend in Nigeria can visit the site, they can look at a stage for you before you pay the next invoice, and you can of course visit yourself whenever you are home.

Questions can come to us on WhatsApp or by email to [email protected], from whatever time zone you are in.

Planning the money from abroad

Because you pay a stage at a time, you can plan your transfers around the stage that comes next instead of the whole house. The stages differ a lot in size. For the Abuja bungalow above, the roof stage is ₦7.8 million to ₦9.1 million, while finishing plus handover add up to ₦46.4 million to ₦54.1 million.

All of these are guide ranges. The written quote, priced for your drawings and site on the day it is written, is the only firm price, and it shows the amount of every stage before the first one begins.

Finishing or renovating a family house

The same way of working applies if you are finishing a house that was started and then stopped, or renovating a family house. For an uncompleted building we look at what is standing and quote for the remaining stages only; see how to finish an uncompleted house. Renovation work is priced once we have seen the building; see renovation. Our building from abroad page describes the service as a whole.

Questions and answers

Do I need to come home to start building?

No. You can get a guide figure, ask for a written quote and agree the stages from abroad. No drawings yet? They can be arranged before quoting.

How will I know a stage is done before I pay again?

Each stage ends with a report and photos. You are not invoiced for the next stage until you have looked at the last one, in the report or through someone you trust on site.

Can I get the quote by email?

Yes. Add your email address when you ask for the written quote and we send it there as well as on WhatsApp.

Can you tell me when the house will be finished?

We do not give dates on this site. The stage reports show you where the house stands at every point, and each new stage begins once its invoice is paid.

Can I pay from outside Nigeria?

Yes. Every stage has an invoice of its own, and you can settle it from wherever you are.

Where to go next

See what your building will cost, stage by stage.

Guide ranges at prices on 16 November 2026. Then ask for one written quote, paid in stages.