What is a bill of quantities?

A bill of quantities, or BoQ, is a document that lists every item of material and work in a building, with the quantity of each measured from the drawings. Once each item is priced, the BoQ adds up to the cost of the job.

A written quote in stages gathers that same work under the five stages of the building, so each stage carries one amount, invoiced before the stage begins.

What a BoQ lists

A BoQ breaks a building into many small items and gives each one a description, a unit of measurement and a quantity. Typical lines look like this:

  • digging the foundation trenches, in cubic metres;
  • concrete for the footing and the ground floor slab, in cubic metres;
  • reinforcement rods, by weight;
  • blockwork for the walls, in square metres;
  • plastering, tiling and painting, in square metres;
  • doors, windows and sanitary fittings, counted one by one.

When the BoQ is priced, every line gets a rate and a total. The totals are added up section by section, and the sections give the figure for the whole building.

Where the quantities come from

Quantities are measured from the drawings: the floor plans, the elevations and the details. A BoQ is therefore only as good as the drawings it was taken from. Change the size of a room or add a window, and several lines change with it.

That also means a BoQ made for one house does not fit another, even one with the same number of bedrooms. Two 3-bedroom bungalows can be drawn small or large, with a plain roof or a complicated one, and their BoQs will differ accordingly.

A BoQ and a written quote in stages

Both describe the same building; what differs is how the work is grouped. A BoQ groups it by trade or element: all the concrete together, all the blockwork together, all the painting together. A quote in stages groups it in the order the house goes up, from the foundation through the walls and structure and the roof to finishing and, last, handover.

Grouping by stage matters when you pay. Every stage amount is a whole piece of the building that you can see once it is done, and it is invoiced before its work starts. Paint, for instance, turns up twice in a stage quote: the first coats under finishing, and the final paint under handover. The five stages guide lists what sits in each.

Why BoQ prices go out of date

A priced BoQ is a snapshot of the market on the day it was priced. Cement, rods, blocks and roofing sheets all change price, so a BoQ priced on an earlier date, or one downloaded from the internet, will not match what the same items cost now.

Our guide figures carry their date for the same reason. A 3-bedroom bungalow finished to mid-range comes to ₦75.7 million to ₦88.3 million in a city like Kaduna or Abeokuta, using 16 November 2026 prices, and your written quote uses the prices of the day it is written.

Checking a BoQ or quote you have been given

Whichever form it takes, check that the quantities match your drawings, look for what has been left out, find the date of the prices, and see whether VAT is shown where it applies. How to read a building quote walks through each of these.

Do you need a BoQ before asking us?

No. You need neither a BoQ nor drawings to ask for a written quote. Start with the calculator, then send your request from it or message us on WhatsApp. We come back to you with a few questions about the plot and any plans. Having no drawings yet is no obstacle, since they can be arranged ahead of the quote. If you already hold a BoQ, mention it when you write.

Questions and answers

Is a bill of quantities the same as a quote?

Not quite. A BoQ lists quantities, and a priced BoQ adds the cost of each item. A quote is the offer to do the work for a stated amount. Ours is written in stages, with an amount for each stage.

Can I use a BoQ for a 3-bedroom bungalow I found online?

Only as a rough reference. It was measured from someone else's drawings and priced on another date. For a dated guide, use the 3-bedroom bungalow cost page; for a firm price, ask for a written quote.

Does a BoQ include the fence and borehole?

Only if they were measured, so check. In our figures, fencing, a borehole and compound paving are extras you choose to add, each with its own guide range.

Do the quantities change with the finish?

Some do. The structure stays much the same, but tiles, ceilings, doors, windows and fittings change with the finish level, and their lines change with them. See standard, mid-range or premium finish.

Where to go next