How to read a building quote
Check five things: what each stage covers and costs, what has been left out, the date the prices were taken, which extras are in, and whether VAT applies. If any of these is missing, ask before you agree to anything.
A quote that answers all five can be compared fairly with another one, and planned for stage by stage.
The stages and what each one covers
A clear quote splits the building into stages and gives each one an amount. Ours always uses the same five, in the order the house goes up: foundation, then walls and structure, then the roof, then finishing, and handover at the end. Read what each stage includes, not only its total. Two quotes can put the septic tank or the kitchen in different places, and a stage that looks low may simply hold less.
With us, each stage amount is also what you will be invoiced, before that stage's work begins, so the stage lines show you how your payments will run. The five stages of building a house lists what belongs where.
What is left out
Every quote leaves something out, so look for the list and read it. These are outside every guide figure of ours:
- land, survey and title;
- drawings, the soil test and building approval;
- furniture, appliances and air conditioners;
- a fence and gate, a borehole or paving, unless you add them;
- VAT, where it applies;
- solar power, cameras, smart home equipment and internet, which have their own ZuraLink lines: ZuraLink Power, ZuraLink Secure, ZuraLink Home and Starlink.
If a quote you are comparing has no such list, ask what it leaves out. A lower total often just means a longer list.
The price date
Building materials change price with the market, so a quote is only as current as the date its prices were taken. Look for that date. Our calculator figures carry the date 16 November 2026, and a written quote from us is priced with the market as it stands on the day it is written, which is what makes it the firm price.
If a quote has no date, ask for one. If it is old, ask for it to be priced again before you pay anything.
Extras outside the house
Fencing with a gate, a borehole with its tank, and a paved compound are often quoted separately, or not at all. Check which ones are in. As a guide, for a site in Jos or Calabar at 16 November 2026 prices:
- fence and gate around one plot: ₦11.2 million to ₦13.2 million;
- borehole and tank: ₦1.6 million to ₦2.2 million;
- paving for a one-plot compound: ₦4.4 million to ₦5.1 million.
The fence and paving figures follow the plot size, from half a plot to two plots, and all three rise in Lagos, Abuja and Port Harcourt. You can add any of them in the calculator and see it on its own line.
VAT where it applies
Our figures do not include VAT where it applies. When you read any quote, check whether its amounts include VAT, leave it out, or say nothing about it. Setting a quote with VAT against one without it will mislead you, so put both on the same footing before you choose.
The house the quote describes
Finally, check that the quote is for the house you have in mind: the floor area, the number of floors and the finish level. A 4-bedroom duplex in our figures is about 270 square metres over two floors; a bigger plan costs more and a smaller one less. The finish should be described in plain words, such as the roof covering, ceilings, tiles, doors, windows and kitchen, so you know what you are paying for. See standard, mid-range or premium finish and what a bill of quantities is.
Questions and answers
Why is my quote higher than the calculator figure?
The calculator is a guide for a house of a set floor area, dated 16 November 2026. Your plan, your plot and market prices on the day of the quote can all move it, and so can any extras you add.
Is the written quote the final price?
It is the firm price for the work it describes, priced on the day it was written. Read what it includes and what it leaves out, because the firm price covers only what is written in it.
What if two quotes split the stages differently?
Line them up by the work, not by the stage names. Move items such as the septic tank, kitchen or final paint into the same place in both, then compare the totals stage by stage.
Do I have to pay the whole quote at once?
Not with us. Each stage is invoiced on its own, before its work starts. See how paying in stages works.
Where to go next
- Building cost calculatorYour building, stage by stage
- Cost of building a house in NigeriaEvery reference building and place
- Cost of a 4-bedroom duplex₦148.5m to ₦173.2m, mid-range finish
- Building cost per square metreBy finish and place
- Bill of quantitiesGuide
- Paying in stagesGuide
- All guidesPlain answers about building