How to finish an uncompleted house

Begin with an inspection. We look over what is already built, say honestly which parts can be kept, and price only the work still to do; stages that are already standing carry no charge.

A 3-bedroom bungalow that already has its roof on comes to ₦44.2 million to ₦51.6 million to complete at mid-range, in a city such as Asaba or Uyo, on prices dated 16 November 2026.

What people mean by a carcass house

In Nigeria an uncompleted building is often called a carcass: the structure is up, but the work that turns it into a home is missing. Some stop at the foundation, some with the walls up, and plenty with the roof on and bare blockwork inside. Because houses here are so often built bit by bit, money, a move abroad or a change of plans can leave one standing at any stage.

None of that is a problem for finishing it. The question is simply what is there, what state it is in, and what is left to do.

The inspection comes first

Before any figure, we come and look at what is standing: the foundation, the walls and columns, and the roof if there is one. Then we say plainly which parts can stay as they are. If something cannot stay, you hear it from us at this point, before any quote is written.

It helps to gather whatever you have: the drawings, photos taken while it was going up, and a note of what was done. None of these is required. Where there are none, we can get drawings made before quoting.

Pricing only what is left

Your quote covers the stages still to be built, and the ones already standing show no amount. For a 3-bedroom bungalow at mid-range in the same kind of city, that works out like this:

How far the house has gotStages still to buildGuide range
Only the foundation is inWalls and structure, roof, finishing, handover₦62.3 million to ₦72.7 million
The walls are upRoof, finishing, handover₦51.6 million to ₦60.2 million
The roof is onFinishing and handover₦44.2 million to ₦51.6 million

Bigger houses follow the same idea. A 4-bedroom duplex with its roof on comes to ₦75.2 million to ₦87.8 million to complete at mid-range, and a 4-bedroom bungalow with only its walls up comes to ₦64.5 million to ₦75.3 million.

Choosing the finish for the rest

Once the roof is on, what is left is finishing and handover, which is exactly where the finish level makes its biggest difference. Kept to standard, the same roofed bungalow needs ₦30.2 million to ₦35.3 million to complete; taken all the way to premium, it needs ₦67.2 million to ₦78.4 million. You are not tied to whatever finish was planned when the house was started. See what each finish level contains.

Paying for the rest in stages

Taking over a house does not change how payment works. Each stage still to come gets its invoice before work on it begins; you see it finished, in person or through the stage report and photos; and only then does the next invoice come. Handover, the last, is sent before the fittings go in. There is more in how paying in stages works.

Wiring for solar, cameras and Starlink before plastering

A house with bare walls is at the right moment for conduits and cables that would otherwise mean cutting into finished plaster. Ask for routes to be left for solar panels and an inverter through ZuraLink Power, for camera, intercom and gate cabling through ZuraLink Secure, for smart switch and curtain wiring through ZuraLink Home, and a cable path for Starlink. Read about smart-ready buildings.

Questions and answers

Will I pay again for the parts already built?

No. Stages that are already standing show no amount in the quote. You pay only for the work still to be done.

Do I need the original drawings?

No, though they help if you have them. If not, drawings can be made for you before we quote.

Why does the calculator not ask about the land here?

Because the foundation is already in. The land mainly affects the foundation stage, and when you finish a building that stage is already standing.

Can you finish a house someone else started?

Yes. Who built the first stages does not change the approach: we look at what is there and price what remains. Our finishing an uncompleted house service page has more.

Where to go next

See what your building will cost, stage by stage.

Guide ranges at prices on 16 November 2026. Then ask for one written quote, paid in stages.